Home
About Apantec
Products & Services
News
Contact Apantec
Links
North Penn Business Park,
4500 North Cannon Ave. Lansdale, PA
19446, USA
Tel No.: (267) 436-3991
Fax: (215) 362-5343

CRAIG MILLS:
Email id: cmills@apantec.com
Tel No.:267-436-4034
Thursday, September 18, 2014
AECL I-125 RMS
More
Friday, July 18, 2014
JNL Area Monitor Channels
More
Providing Innovative Engineering Solutions for Radiation MonitoringProviding Innovative Engineering Solutions for Radiation Monitoring Providing Innovative Engineering Solutions for Radiation Monitoring
Quality Assurance
[-- BACK to About Apantec --]

QUALITY ASSURANCE CONTROLS AND PROCEDURES
Organization
Quality Assurance Program
Design Control
Procurement Control
Instructional Procedures and Drawings
Control of Purchased Material, Equipment, and Services
Identification and Control of Materials, Parts, and Components
Control of Special Processes
Inspection
Test Control
Control of Measuring and Test Equipment
Handling, Storage, and Shipping
Non-conforming Materials, Parts, or Components
Quality Assurance Records
DOCUMENTATION
DRAWINGS
MANUALS
REPORTS

QUALITY ASSURANCE CONTROLS AND PROCEDURES
The Quality Assurance Program established by APANTEC, LLC assures that the required effort, equipment, procedures, and management are directed toward activities necessary to satisfy the quality objectives of furnishing safe and reliable radiation monitoring systems, equipment, and components. The Quality Assurance Program is structured for compliance in accordance with the 18 criteria of 10CFR50, Appendix "B", ANSI/ASME N45.2-1977, ANSI/ASME NQA-1, 1989 Edition through NQA-1C-1992 Addenda, NQA- 2, 1989 Edition through NQA-2B Addenda, Federal Government Specifications and Standards CAN3-Z299.3-85, CAN3-Z286.2-86, CAN/CSA-Q396.1.1-89 and CAN/CSAQ396.1.2- 89. All systems will be controlled by the Quality Assurance Program.
Organization
APANTEC, LLC delineates the relationship between the President and the management organization. The Quality Assurance Program is administered by the quality Assurance Manager (QAM) who is appointed by and reports to the President.
Quality Assurance Program
The Quality Assurance Program is defined and documented by the policies and procedures set forth in the Q. A. Manual. This program covers those services APANTEC, LLC is prepared to provide a client under the auspices of its own Quality Assurance Program criteria and specific requirements associated with these criteria have been adapted to APANTEC, LLC's individual project activities through the Q. A. Program. Controlled copies of the Q. A. Manual are identified with an assigned copy number and maintained by transmittals of revisions, additions, and deletions.
Design Control
APANTEC, LLC design control defines the mechanism ensuring that applicable regulatory requirements, customer specifications, and quality assurance requirements are correctly reflected in corporate specifications, drawings, procedures, and instructions.
Procurement Control
APANTEC, LLC's Quality Assurance Manager reviews all procurement documentation applicable to quality related items and services to assure inclusion of suppliers to have Q. A. programs consistent with pertinent sections of 10CFR50, Appendix "B", ANSI/ASME N45.2, and NQA-1. The suppliers of Q. A. program will be reviewed during the vendor qualification/audit process.
Instructional Procedures and Drawings
Corporate Quality Assurance Procedures are generic procedures delineating instructions, supplementing the Q. A. Manual sections to accomplish specific quality-related activities (e.g., procurement, document control, record storage, etc.).
Control of Purchased Material, Equipment, and Services
Vendor QA pre-award surveys, where applicable, are conducted to verify the existence of systems, procedures, and equipment which are adequate to assure products and services in accordance with APANTEC, LLC and APANTEC, LLC's customer's standards of quality.
Identification and Control of Materials, Parts, and Components
The Quality Assurance Form is used when material is found to be acceptable to the receiving Inspection Department and the material is placed in the accepted material of the stockroom.
Control of Special Processes
Written procedures are established for the control of welding, painting, and soldering special processes.
Inspection
Inspections are performed by personnel assigned to the Quality Control Department, who have been trained in the areas of assigned inspection and are independent of production pressures. The inspector is a person other than the person who performed the activity being inspected.
Test Control
The Quality Control and Test Department Managers review and concur with all Q. C. test procedures and their revisions. The preparation of test procedures is the responsibility of the cognizant engineer, who ensures that all applicable specification and contractual requirements are incorporated.
Control of Measuring and Test Equipment
Applicable procedures for all mechanical and electrical measuring and testing equipment used at APANTEC, LLC are controlled by the Q. A. Department to assure that purchased supplies and manufactured products conform to technical requirements.
Handling, Storage, and Shipping
Packaging and preparation for shipment of applicable products are verified by Quality Control to assure that shipping documents are properly completed.
Non-conforming Materials, Parts, or Components
Corporate internal QA procedures define methods for controlling the identification, segregation and disposition of the non-conforming material and assures corrective action is taken for conditions adverse to quality as identified, which include action taken to prevent recurrence.
Quality Assurance Records
Quality Assurance records are retained as outlined in the Q. A. manual. The retention duration of Quality Assurance records is as stated in the customer's contracts or as defined in NQA-1-1983. Permanent and non-permanent Q. A. records are stored in containers having controlled access.
DOCUMENTATION
All documentation will be submitted in accordance with requirements stipulated in the inquiry and accompanying specifications. As a minimum, documentation will include the following:
DRAWINGS
Drawings will include dimensional outline and installation drawings as well as electrical interfacing information. Detailed wiring schematics and assembly documentation are provided in the Operation and Maintenance Manual. Reproducible drawings will be supplied as specified.
MANUALS
Copies of the Operation and Maintenance Manual will be provided with the system. The manual will include information on installation, operation, maintenance, and calibration of the system, as well as drawings detailing assemblies and schematics.
REPORTS
Detailed calibration reports as well as test data on system components will be provided. All required documentation will be legible and of microfilm quality and meet the requirements of the inquiry. Support documentation will be retained for the life of the plant or if disposition of said documentation is desired, the Buyer will be notified to determine resolution.
 
The final data package will include, but not be limited to:
Certificate of Conformance to the Purchase Order
Factory Test Reports
Mechanical and electrical equipment installation drawings and manuals including: dimensional outline drawings, recommended mounting techniques, wiring, powering and grounding instructions and drawings, etc.
Major manufacturing drawings for the monitor, including assembly drawings, electrical schematics, wiring diagrams and detailed Bills of Material.
Drawings and technical data sheets of subassemblies, components, devices, appurtenances, and fittings that are part of the final assembly of the monitor.
Complete calibration procedures and results for detectors with results traceable to the National Bureau of Standards and Technology (NIST).